Fortum Kraftwerk Burghausen GmbH, Wacker Chemie, Gas turbine power plant
Gas turbine power plant with steam boiler
Building volume: 44 000 m3
Building area: 1 100 m2
Preparation of tender documents for the 7 largest subcontracts
Complete civil design
Steel structures:
Construction steel about 1 200 tons
In total about 8 000 steel work shop drawings
Design with the Tekla Structures program.
Cast-in situ concrete:
Foundations, slabs, staircase slip cast,
turbine foundation, machine foundations,
gas station and safety walls for transformers
Other structures: exterior walls, roofs
Erection of steel structure: February - June 2000 |